Follow
André Paixão
André Paixão
Assistant Researcher at LNEC
Verified email at lnec.pt
Title
Cited by
Cited by
Year
Transition zones to railway bridges: track measurements and numerical modelling
A Paixão, E Fortunato, R Calçada
Engineering structures 80, 435-443, 2014
1182014
Design and construction of backfills for railway track transition zones
A Paixao, E Fortunato, R Calcada
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2013
1122013
The effect of differential settlements on the dynamic response of the train–track system: A numerical study
A Paixão, E Fortunato, R Calçada
Engineering structures 88, 216-224, 2015
852015
Under sleeper pads in transition zones at railway underpasses: numerical modelling and experimental validation
C Alves Ribeiro, A Paixão, E Fortunato, R Calçada
Structure and Infrastructure Engineering 11 (11), 1432-1449, 2015
752015
Numerical simulations to improve the use of under sleeper pads at transition zones to railway bridges
A Paixão, JN Varandas, E Fortunato, R Calçada
Engineering structures 164, 169-182, 2018
672018
Photogrammetry for digital reconstruction of railway ballast particles–A cost-efficient method
A Paixão, R Resende, E Fortunato
Construction and Building Materials 191, 963-976, 2018
652018
On the use of under sleeper pads on transition zones at railway underpasses: experimental field testing
R Paixão, A., Alves Ribeiro, C., Pinto, N.M.P, R., Fortunato, E. & Calçada
Structure and Infrastructure Engineering 11 (2), 112-128, 2015
612015
A numerical study on the influence of backfill settlements in the train/track interaction at transition zones to railway bridges
A Paixão, E Fortunato, R Calçada
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2016
482016
Long-term deformation of railway tracks considering train-track interaction and non-linear resilient behaviour of aggregates–a 3D FEM implementation
JN Varandas, A Paixão, E Fortunato, BZ Coelho, P Hölscher
Computers and Geotechnics 126, 103712, 2020
452020
Transition zones in railway tracks: An experimental and numerical study on the structural behaviour
ALM Paixão
PQDT-Global, 2014
452014
Railway track transition zones: design, construction, monitoring and numerical modelling
E Fortunato, A Paixão, R Calçada
International Journal of Railway Technology 2 (4), 33-58, 2013
452013
A numerical study on the stress changes in the ballast due to train passages
JN Varandas, A Paixão, E Fortunato, P Hölscher
Procedia engineering 143, 1169-1176, 2016
442016
A study on the dynamic train-track interaction over cut-fill transitions on buried culverts
JN Varandas, A Paixão, E Fortunato
Computers & Structures 189, 49-61, 2017
382017
Railway track condition assessment at network level by frequency domain analysis of GPR data
S Fontul, A Paixão, M Solla, L Pajewski
Remote Sensing 10 (4), 559, 2018
342018
Geomechanical assessment of an inert steel slag aggregate as an alternative ballast material for heavy haul rail tracks
BG Delgado, AV da Fonseca, E Fortunato, A Paixão, R Alves
Construction and Building Materials 279, 122438, 2021
312021
Abrasion evolution of steel furnace slag aggregate for railway ballast: 3D morphology analysis of scanned particles by close-range photogrammetry
A Paixão, E Fortunato
Construction and Building Materials 267, 121225, 2021
312021
Non-linear behaviour of geomaterials in railway tracks under different loading conditions
A Paixão, JN Varandas, E Fortunato, R Calçada
Procedia engineering 143, 1128-1135, 2016
312016
Smartphone’s sensing capabilities for on-board railway track monitoring: structural performance and geometrical degradation assessment
A Paixão, E Fortunato, R Calçada
Advances in civil engineering 2019, 2019
292019
A contribution for integrated analysis of railway track performance at transition zones and other discontinuities
A Paixao, E Fortunato, R Calcada
Construction and Building Materials 111, 699-709, 2016
242016
Numerical modelling of railway bridge approaches: influence of soil non-linearity
JN Varandas, A Paixão, E Fortunato, P Hölscher, R Calçada
The Int. J. of Railway Technology 3 (4), 73-95, 2014
232014
The system can't perform the operation now. Try again later.
Articles 1–20