Heuristics for the unrelated parallel machine scheduling problem with setup times G Rabadi, RJ Moraga, A Al-Salem Journal of Intelligent Manufacturing 17, 85-97, 2006 | 252 | 2006 |
Greedy algorithms and metaheuristics for a multiple runway combined arrival-departure aircraft sequencing problem G Hancerliogullari, G Rabadi, AH Al-Salem, M Kharbeche Journal of Air Transport Management 32, 39-48, 2013 | 143 | 2013 |
An integrated supply chain problem with environmental considerations A Diabat, M Al-Salem International Journal of Production Economics 164, 330-338, 2015 | 136 | 2015 |
A tabu search algorithm to minimize the makespan for the unrelated parallel machines scheduling problem with setup times M Helal, G Rabadi, A Al-Salem International Journal of Operations Research 3 (3), 2006 | 91 | 2006 |
Runway capacity management–an empirical study with application to Doha International Airport F Farhadi, A Ghoniem, M Al-Salem Transportation Research Part E: Logistics and Transportation Review 68, 53-63, 2014 | 78 | 2014 |
A closed-loop supply chain management problem: Reformulation and piecewise linearization M Al-Salem, A Diabat, D Dalalah, M Alrefaei Journal of Manufacturing Systems 40, 1-8, 2016 | 73 | 2016 |
Scheduling to minimize makespan on unrelated parallel machines with sequence dependent setup times A Al-Salem Engineering Journal of the University of Qatar 17 (1), 177-187, 2004 | 67 | 2004 |
Pedestrians' crossing behavior at marked crosswalks on channelized right-turn lanes at intersections D Muley, M Kharbeche, W Alhajyaseen, M Al-Salem Procedia computer science 109, 233-240, 2017 | 53 | 2017 |
Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level MK Msakni, A Diabat, G Rabadi, M Al-Salem, M Kotachi Computers & Operations Research 99, 218-233, 2018 | 35 | 2018 |
Pedestrians’ speed analysis at signalized crosswalks D Muley, W Alhajyaseen, M Kharbeche, M Al-Salem Procedia computer science 130, 567-574, 2018 | 30 | 2018 |
A heuristic to minimize makespan in proportional parallel flow shops A Al-Salem International Journal of Computing & Information Sciences 2 (2), 98, 2004 | 30 | 2004 |
Heuristics, metaheuristics and approximate methods in planning and scheduling G Rabadi Springer, 2016 | 27 | 2016 |
Minimizing the total completion time in a two-machine flowshop problem with time delays MK Msakni, W Khallouli, M Al-Salem, T Ladhari Engineering Optimization 48 (7), 1164-1181, 2016 | 26 | 2016 |
On the optimal computing budget allocation problem for large scale simulation optimization M Al-Salem, M Almomani, M Alrefaei, A Diabat Simulation Modelling Practice and Theory 71, 149-159, 2017 | 17 | 2017 |
Multiple-runway aircraft sequencing problems using mixed-integer programming A Al-Salem, F Farhadi, M Kharbeche, A Ghoniem IIE Annual Conference. Proceedings, 1, 2012 | 15 | 2012 |
Planning and management of major sporting events: a survey G Rabadi, W Khallouli, M Al-Salem, A Ghoniem International Journal of Planning and Scheduling 2 (2), 154-178, 2015 | 14 | 2015 |
ISO 9000: 2000 quality management standard: experience in the state of Qatar K Al-Khalifa, TA Mohamed, A Al-Salem International Journal of Productivity and Quality Management 3 (4), 457-471, 2008 | 13 | 2008 |
System requirements and optimization of multi-chillers district cooling plants R Ismaen, TY El Mekkawy, S Pokharel, M Al-Salem Energy 246, 123349, 2022 | 11 | 2022 |
Heuristic and Exact Algorithms for the Two‐Machine Just in Time Job Shop Scheduling Problem M Al-Salem, L Bedoya-Valencia, G Rabadi Mathematical Problems in Engineering 2016 (1), 6591632, 2016 | 11 | 2016 |
Optimization of extracellular lipase production by Penicillium chrysogenum using factorial design MS Shafei, TA Mohamed, IS Abd Elsalam Malaysian Journal of Microbiology 7 (2), 71-77, 2011 | 11 | 2011 |