Hossein Farahmand
TitleCited byYear
Balancing market integration in the Northern European continent
H Farahmand, GL Doorman
Applied Energy 96, 316-326, 2012
582012
Hybrid mutation particle swarm optimisation method for available transfer capability enhancement
H Farahmand, M Rashidinejad, A Mousavi, AA Gharaveisi, MR Irving, ...
International Journal of Electrical Power & Energy Systems 42 (1), 240-249, 2012
562012
Transmission expansion planning in Northern Europe in 2030—Methodology and analyses
S Jaehnert, O Wolfgang, H Farahmand, S Völler, D Huertas-Hernando
Energy Policy 61, 125-139, 2013
462013
ATC enhancement using TCSC via artificial intelligent techniques
M Rashidinejad, H Farahmand, M Fotuhi-Firuzabad, AA Gharaveisi
Electric Power Systems Research 78 (1), 11-20, 2008
442008
Implementation of FACTS devices for ATC enhancement using RPF technique
H Farahmand, M Rashidi-Nejad, M Fotuhi-Firoozabad
2004 Large Engineering Systems Conference on Power Engineering (IEEE Cat. No …, 2004
382004
Balancing market integration in the Northern European continent: A 2030 case study
H Farahmand, T Aigner, GL Doorman, M Korpas, D Huertas-Hernando
IEEE Transactions on Sustainable Energy 3 (4), 918-930, 2012
372012
Nordic hydropower flexibility and transmission expansion to support integration of North European wind power
H Farahmand, S Jaehnert, T Aigner, D Huertas‐Hernando
Wind Energy 18 (6), 1075-1103, 2015
342015
Modelling of prices using the volume in the Norwegian regulating power market
S Jaehnert, H Farahmand, GL Doorman
2009 IEEE Bucharest PowerTech, 1-7, 2009
332009
Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration
D Huertas‐Hernando, H Farahmand, H Holttinen, J Kiviluoma, E Rinne, ...
Wiley Interdisciplinary Reviews: Energy and Environment 6 (1), e220, 2017
232017
Integrated power system balancing in northern europe-models and case studies
H Farahmand
NTNU-trykk, 2012
212012
Reserve procurement and transmission capacity reservation in the Northern European power market
Y Gebrekiros, G Doorman, S Jaehnert, H Farahmand
International Journal of Electrical Power & Energy Systems 67, 546-559, 2015
192015
Optimal wind farm bids under different balancing market arrangements
KW Ravnaas, G Doorman, H Farahmand
2010 IEEE 11th International Conference on Probabilistic Methods Applied to …, 2010
192010
Proactive operation of electric vehicles in harmonic polluted smart distribution networks
S Pirouzi, J Aghaei, T Niknam, H Farahmand, M Korpås
IET Generation, Transmission & Distribution 12 (4), 967-975, 2017
142017
Benefits of cross-border reserve procurement based on pre-allocation of transmission capacity
YT Gebrekiros, GL Doorman, H Farahmand, S Jaehnert
2013 IEEE Grenoble Conference, 1-6, 2013
142013
Possibilities of Nordic hydro power generation flexibility and transmission capacity expansion to support the integration of Northern European wind power production: 2020 and …
H Farahmand, S Jaehnert, T Aigner, D Huertas-Hernando
TWENTIES Deliverable D16. 3, SINTEF Energy Research, 2013
142013
Flow based activation of reserves in the nordic power system
H Farahmand, SMA Hosseini, GL Doorman, OB Fosso
IEEE PES General Meeting, 1-8, 2010
142010
Introducing system flexibility to a multinational transmission expansion planning model
M Kristiansen, M Korpås, H Farahmand, I Graabak, P Härtel
2016 Power Systems Computation Conference (PSCC), 1-7, 2016
132016
Towards robust OPF solution strategy for the future AC/DC grids: case of VSC-HVDC-connected offshore wind farms
A Nikoobakht, J Aghaei, T Niknam, V Vahidinasab, H Farahmand, ...
IET Renewable Power Generation 12 (6), 691-701, 2018
112018
Impact of system power losses on the value of an offshore grid for North Sea offshore wind
H Farahmand, D Huertas-Hernando, L Warland, M Korpås, HG Svendsen
2011 IEEE Trondheim PowerTech, 1-7, 2011
112011
Bidding in the frequency restoration reserves (FRR) market for a hydropower unit
Y Gebrekiros, G Doorman, S Jaehnert, H Farahmand
IEEE PES ISGT Europe 2013, 1-5, 2013
102013
The system can't perform the operation now. Try again later.
Articles 1–20