Følg
Bryan Hubbard
Bryan Hubbard
Verifisert e-postadresse på PURDUE.EDU - Startside
Tittel
Sitert av
Sitert av
År
The emergence of the solar photovoltaic power industry in China
Z Zhao, SY Zhang, B Hubbard, X Yao
Renewable and Sustainable Energy Reviews 21, 229-236, 2013
1302013
Feasibility study of UAV use for RFID material tracking on construction sites
B Hubbard, H Wang, M Leasure, T Ropp, T Lofton, S Hubbard, S Lin
51st ASC Annual international conference proceedings, 669-676, 2015
912015
A Chimera scheme for incompressible viscous flows with application to submarine hydrodynamics
B Hubbard, HC Chen
Fluid dynamics conference, 2210, 1994
781994
Offsite production and manufacturing for innovative construction: People, process and technology
JS Goulding, FP Rahimian
Routledge, 2019
502019
Air-to-air atmospheric exchanger for condensing cooling tower effluent
BJ Hubbard, EF Mockry, OL Kinney Jr
US Patent 6,663,694, 2003
312003
A review of sustainability metrics for the construction and operation of airport and roadway infrastructure
SML Hubbard, B Hubbard
Frontiers of Engineering Management 6, 433-452, 2019
282019
Unmanned Aircraft Systems (UAS) for Bridge Inspection Safety
B Hubbard, S Hubbard
Drones 4 (3), 40, 2020
232020
Ergonomics: Case study: Safety training issues for Hispanic construction workers
J McGlothlin, B Hubbard, F Aghazadeh, S Hubbard
Journal of occupational and environmental hygiene 6 (9), D45-D50, 2009
212009
Calculations of unsteady flows around bodies with relative motion using a Chimera RANS method
B Hubbard, HC Chen
Engineering Mechanics, 782-785, 1995
201995
Air-to-air atmospheric exchanger for condensing cooling tower effluent
BJ Hubbard, EF Mockry, OL Kinney Jr
US Patent 6,663,087, 2003
182003
Evaluation of cut-off saw exposure control methods for respirable dust and crystalline silica in roadway construction
B Middaugh, B Hubbard, N Zimmerman, J McGlothlin
Journal of Occupational and Environmental Hygiene 9 (3), 157-165, 2012
162012
A meta-analysis of critical causes of project delay using spearman’s rank and relative importance index integrated approach
Q Amarkhil, E Elwakil, B Hubbard
Canadian Journal of Civil Engineering 48 (11), 1498-1507, 2021
152021
Multinational contracting and the eclectic paradigm of internationalization
A Rahman, AJ Bridge, S Rowlinson, B Hubbard, B Xia
Engineering, construction and architectural management 25 (11), 1418-1435, 2018
142018
Construction management curriculum transformation through project-based learning; Part 1 of a progressive case study
B Benhart, J Cabral, B Hubbard, J Metzinger, P Morgan, S Santon
Associated Schools of Construction International Proceedings of the 53rd …, 2017
132017
A survey study on industrial construction project supply chain: On time performance and practices of structural steel and pipe spools
H Wang, B Hubbard
Procedia engineering 196, 653-659, 2017
112017
Activities to enhance civil engineering recruitment and coordination with industry
BJ Hubbard, SM Hubbard
Transportation research record 2109 (1), 22-30, 2009
112009
RFID applied to supply chain logistics in disaster recovery
H Wang, BJ Hubbard, S Hubbard
92014
Construction Site Planning and Logistical Operations: Site-Focused Management for Builders
RR Rapp, BL Benhart
Purdue University Press, 2015
72015
Utilization of the AISC steel sculpture for an introductory construction plan reading course
BJ Hubbard, SM Hubbard
ASC Proceedings of the 45th Annual Conference, University of Florida …, 2009
62009
Inherent Delay Risk Assessment in Construction: A proactive approach, mitigating the impact of causes of delay on schedule
Q Amarkhil, E Elwakil, BJ Hubbard
2021 IEEE Conference on Technologies for Sustainability (SusTech), 1-5, 2021
52021
Systemet kan ikke utføre handlingen. Prøv på nytt senere.
Artikler 1–20