Simultaneous optimization of multiple objective functions for reservoir modeling M Emami Niri, DE Lumley Geophysics 80 (5), M53-M67, 2015 | 24 | 2015 |
A multiple-input deep residual convolutional neural network for reservoir permeability prediction M Masroor, ME Niri, MH Sharifinasab Geoenergy Science and Engineering 222, 211420, 2023 | 18 | 2023 |
Investigating the capability of data-driven proxy models as solution for reservoir geological uncertainty quantification RA Kolajoobi, H Haddadpour, ME Niri Journal of Petroleum Science and Engineering 205, 108860, 2021 | 15 | 2021 |
Developing grid-based smart proxy model to evaluate various water flooding injection scenarios Y Haghshenas, M Emami Niri, S Amini, R Amiri Kolajoobi Petroleum Science and Technology 38 (17), 870-881, 2020 | 15 | 2020 |
Probabilistic reservoir-property modeling jointly constrained by 3D-seismic data and hydraulic-unit analysis ME Niri, DE Lumley SPE Reservoir Evaluation & Engineering 19 (02), 253-264, 2016 | 12 | 2016 |
Uncertainty assessment in reservoir performance prediction using a two-stage clustering approach: Proof of concept and field application H Haddadpour, ME Niri Journal of Petroleum Science and Engineering 204, 108765, 2021 | 11 | 2021 |
Application of machine and deep learning techniques to estimate NMR-derived permeability from conventional well logs and artificial 2D feature maps M Masroor, M Emami Niri, AH Rajabi-Ghozloo, MH Sharifinasab, ... Journal of Petroleum Exploration and Production Technology 12 (11), 2937-2953, 2022 | 10 | 2022 |
A physically-supported data-driven proxy modeling based on machine learning classification methods: Application to water front movement prediction Y Haghshenas, ME Niri, S Amini, RA Kolajoobi Journal of Petroleum Science and Engineering 196, 107828, 2021 | 10 | 2021 |
Metaheuristic optimization approaches to predict shear-wave velocity from conventional well logs in sandstone and carbonate case studies ME Niri, RA Kolajoobi, MK Arbat, MS Raz Journal of Geophysics and Engineering 15 (3), 1071-1083, 2018 | 10 | 2018 |
Estimation of subsurface geomodels by multi-objective stochastic optimization ME Niri, DE Lumley Journal of Applied Geophysics 129, 187-199, 2016 | 10 | 2016 |
Improving permeability estimation of carbonate rocks using extracted pore network parameters: a gas field case study MS Jamshidi Gohari, M Emami Niri, J Ghiasi-Freez Acta Geophysica 69 (2), 509-527, 2021 | 9 | 2021 |
Calibration of two rock-frame models using deterministic and probabilistic approaches: Application to a carbonate reservoir in south-west Iran A Heidari, N Amini, H Amini, ME Niri, A Zunino, TM Hansen Journal of Petroleum Science and Engineering 192, 107266, 2020 | 9 | 2020 |
3D modeling of geomechanical elastic properties in a carbonate-sandstone reservoir: a comparative study of geostatistical co-simulation methods M Nazari Ostad, ME Niri, M Darjani Journal of Geophysics and Engineering 15 (4), 1419-1431, 2018 | 9 | 2018 |
Pore-type identification of a heterogeneous carbonate reservoir using rock physics principles: a case study from south-west Iran M Emami Niri, F Mehmandoost, H Nosrati Acta Geophysica 69, 1241-1256, 2021 | 8 | 2021 |
Rock physics analysis and modelling using well logs and seismic data for characterising a heterogeneous sandstone reservoir in SW of Iran A Johari, M Emami Niri Exploration Geophysics 52 (4), 446-461, 2021 | 8 | 2021 |
The Western Australia Modeling project—Part 1: Geomodel building J Shragge, J Bourget, D Lumley, J Giraud, T Wilson, A Iqbal, M Emami Niri, ... Interpretation 7 (4), T773-T791, 2019 | 8 | 2019 |
3D and 4D Seismic Data Integration in Static and Dynamic Reservoir Modeling: A Review M Emami Niri Journal of Petroleum Science and Technology 8 (2), 38-56, 2018 | 8 | 2018 |
Improving forecast uncertainty quantification by incorporating production history and using a modified ranking method of geostatistical realizations K Monfaredi, M Emami Niri, B Sedaee Journal of Energy Resources Technology 142 (9), 093004, 2020 | 7 | 2020 |
Initialising reservoir models for history matching using pre-production 3D seismic data: constraining methods and uncertainties ME Niri, DE Lumley Exploration Geophysics 48 (1), 37-48, 2017 | 7 | 2017 |
The Western Australia Modeling project—Part 2: Seismic validation J Shragge, D Lumley, J Bourget, T Potter, T Miyoshi, B Witten, J Giraud, ... Interpretation 7 (4), T793-T807, 2019 | 6 | 2019 |