Train–track–bridge modelling and review of parameters D Cantero, T Arvidsson, E OBrien, R Karoumi Structure and Infrastructure Engineering 12 (9), 1051-1064, 2016 | 109 | 2016 |
Train–bridge interaction–a review and discussion of key model parameters T Arvidsson, R Karoumi International Journal of Rail Transportation 2 (3), 147-186, 2014 | 101 | 2014 |
Train running safety on non-ballasted bridges T Arvidsson, A Andersson, R Karoumi International journal of rail transportation 7 (1), 1-22, 2019 | 46 | 2019 |
Statistical screening of modelling alternatives in train–bridge interaction systems T Arvidsson, R Karoumi, C Pacoste Engineering structures 59, 693-701, 2014 | 42 | 2014 |
Train–track–bridge interaction for the analysis of railway bridges and train running safety T Arvidsson KTH Royal Institute of Technology, 2018 | 26 | 2018 |
Train–Bridge Interaction: Literature Review and Parameter Screening T Arvidsson KTH Royal Institute of Technology, 2014 | 15 | 2014 |
Höghastighetsprojekt-Bro: Inventering av järnvägsbroar för ökad hastighet på befintliga banor C Johansson, T Arvidsson, D Martino, M Solat Yavari, A Andersson, ... KTH Royal Institute of Technology, 2011 | 13 | 2011 |
Modelling Alternatives in the Dynamic Interaction of Freight Trains and Bridges T Arvidsson, R Karoumi Proceedings of the Second International Conference on Railway Technology …, 2014 | 5 | 2014 |
Dynamic analysis of a portal frame railway bridge using frequency dependent soil structure interaction T Arvidsson, J Li | 5 | 2011 |
Influence of Sleeper Passing Frequency on Short Span Bridges: Validation against Measured Results T Arvidsson, A Zangeneh, D Cantero, A Andersson First International Conference on Rail Transportation, Chengdu, China, July …, 2017 | 3 | 2017 |
Dynamic analysis of load effects for railway bridges on Malmbanan A Andersson, T Arvidsson | 2 | 2020 |
Train-track-bridge interaction to allow for increased axle loads on iron ore lines A Andersson, T Arvidsson The Second International Conference on Rail Transportation, Chengdu, Sichuan …, 2021 | | 2021 |
Train-Track-Bridge Interaction for non-ballasted Railway Bridges on High-Speed Lines A Andersson, T Arvidsson | | 2017 |
Requirements toward the freight system of 2030/2050; CAPACITY4RAIL project Deliverable 21.1; European Commission contract no. FP7-605650 BL Nelldal, M Berg, DMZ Islam, S Ricci, I Gonzalez, A Toubol, L Schmitt, ... Newcastle University, 2014 | | 2014 |