Follow
Amita Baranwal
Amita Baranwal
Verified email at lpu.co.in
Title
Cited by
Cited by
Year
Design and implementation of qth quantile‐unbiased tr‐chart for monitoring times between events
N Kumar, A Baranwal
Quality and Reliability Engineering International 35 (4), 1061-1080, 2019
232019
Shewhart‐type Phase II control charts for monitoring times to an event with a guaranteed in‐control and good out‐of‐control performance
N Kumar, A Baranwal, S Chakraborti
Quality and Reliability Engineering International 36 (1), 231-246, 2020
52020
Optimal Design of 𝒕𝒓-chart under Two Perspectives with Estimated Parameter
A Baranwal, T Singh
Journal of Scientific Research 66 (3), 2022
2022
TESTS FOR DISCORDANCY OF SUSPECTED OBSERVATIONS IN A RAYLEIGH SAMPLE.
N Kumar, A Baranwal
International Journal of Agricultural & Statistical Sciences 14 (2), 2018
2018
The system can't perform the operation now. Try again later.
Articles 1–4