Follow
Chowdury M L Rahman
Title
Cited by
Cited by
Year
Study and analysis of work postures of workers working in a ceramic industry through rapid upper limb assessment (RULA)
CML Rahman
International Journal of Engineering and Applied Sciences 5 (03), 14-20, 2014
482014
Assessment of total productive maintenance implementation in a semiautomated manufacturing company through downtime and mean downtime analysis
CML Rahman
2015 International Conference on Industrial Engineering and Operations …, 2015
302015
Minimization of Defects in the Sewing Section of a Garment Factory through DMAIC Methodology of Six Sigma
CML Rahman, SM Uddin
ISCA Research Journal of Engineering Sciences (IJES) 3 (9), 21-26, 2014
23*2014
PROCESS FLOW IMPROVEMENT PROPOSAL OF A BATCH MANUFACTURING SYSTEM USING ARENA SIMULATION MODELING
CML RAHMAN, SU SABUJ
The Review of General Management 21 (1), 63-77, 2015
222015
Assessment of Total Productive Maintenance Implementation through Downtime and Mean Downtime Analysis (Case study: a Semi-automated Manufacturing Company of Bangladesh)
CML Rahman, MA Hoque, SM Uddin
International Organization of Scientific Research (IOSR) Journal of …, 2014
222014
Application of Lean Manufacturing Tools for Performance Analysis: A Case Study
R Karim, CML Rahman
Proceedings of the 2012 International Conference on Industrial Engineering …, 2012
202012
Evaluation of Total Productive Maintenance Implementation in a Selected Semi-Automated Manufacturing Industry
CML Rahman, MA Hoque
IJMER 4 (8), 19-31, 2014
172014
EVALUATION OF WORK POSTURES-THE ASSOCIATED RISK ANALYSIS AND THE IMPACT ON LABOR PRODUCTIVITY
CML Rahman, SM Uddin, MA Karim, M Ahmed
Asian Research Publishing Network (ARPN) Journal of Engineering and Applied …, 2015
162015
Importance of human factors in industrial engineering and design
CML Rahman, SM Uddin, M Iqbal
SEU J Sci Eng 8 (1-2), 7-13, 2014
102014
Re-balancing of Generalized Assembly Lines - Searching Optimal Solutions for SALBP
CML Rahman
Proceedings of 2010 International Conference on Industrial Engineering and …, 2010
102010
A PERFORMANCE ANALYSIS OF OEE & IMPROVEMENT POTENTIAL AT A SELECTED APPAREL INDUSTRY
R Karim, CML Rahman
Proceedings of the 6th International Mechanical Engineering Conference and …, 2012
82012
Study and Analysis of the Scope of Value Stream Mapping Technique Application in a Selected Garments Factory of Bangladesh
KMMR Sobuj, CML Rahman
International Journal of Engineering Research and General Science 3 (2), 998 …, 2015
52015
THE RELATIONSHIP AMONG ISOMETRIC GRIP STRENGTH RECOVERY AND ANTHROPOMETRIC PARAMETERS
SM Uddin, CML Rahman
International Journal of Research in Engineering and Technology 4 (1), 273-279, 2015
32015
Measurement & Analysis of Productivity and Finding Solutions to Improve Productivity in a Garment Factory in Bangladesh
MA Samad, CML Rahman, MS Islam
International Journal of Engineering and Advanced Technology (IJEAT) 7 (4 …, 2018
22018
Service Development Strategy Using QFD for Customer Satisfaction in a Bank
CML Rahman, MSI Khan, MJ Islam, S Nova
Proceedings of the International Conference on Industrial & Mechanical …, 2020
12020
ASSESSING THE READINESS LEVEL OF RMG SECTOR OF BANGLADESH TOWARDS IMPLEMENTING INDUSTRY 4.0
CML Rahman, MU Syed, NA Fahim, MR Mia
Khulna University Studies, 169-182, 2023
2023
Evaluation of a Sustainable Effluent Treatment Plant for Textile Industries
MA Samad, RC Kar, CML Rahman, A Rahaman
Journal of Engineering Research, Innovation and Education 3 (2), 59-64, 2021
2021
Effects of Anthropometric Factors on Grip Strength and Work Capacity
SM Uddin, CML Rahman, MA Karim, MA Samad
Journal of Engineering Research, Innovation and Education 1 (1), 11-20, 2019
2019
RELATIONSHIP BETWEEN ENVIRONMENTAL MANUFACTURING PRACTICES AND THEIR COMPETITIVE OUTCOMES
SM Uddin, CML Rahman, NI Chowdhury, MP Shaikh, F Al-Amin
Journal of Mechanical Engineering 48 (1), 1-10, 2018
2018
Comparative Performance Analysis of Semi-automatic and Automatic Cement Packing process
CML Rahman, AHM Shamsuzzoha
Proceedings of the International Conference on Mechanical Engineering (ICME …, 2005
2005
The system can't perform the operation now. Try again later.
Articles 1–20