Business process re-engineering the supply chain GN Evans, DR Towill, MM Naim Production planning & control 6 (3), 227-237, 1995 | 163 | 1995 |
Analysis and design of an adaptive minimum reasonable inventory control system DR Towill, GN Evans, P Cheema Production Planning & Control 8 (6), 545-557, 1997 | 124 | 1997 |
Dynamic Supply Chain Performance: Assessing the Impact ofInformation Systems GN Evans, MM Naim, DR Towill Logistics Information Management 6 (4), 15-25, 1993 | 113 | 1993 |
Application of a simulation methodology to the redesign of a logistical control system GN Evans, MM Naim, DR Towill International Journal of Production Economics 56, 157-168, 1998 | 65 | 1998 |
The BPR SCOPE concept in leveraging improved supply chain performance D Berry, GN Evans, R Mason‐Jones, DR Towill Business Process Management Journal 5 (3), 254-275, 1999 | 55 | 1999 |
The dynamics of capacity constrained supply chains GN Evans, MM Naim Proceedings of international system dynamics conference, 28-35, 1994 | 46 | 1994 |
Pipeline information survey: a UK perspective D Berry, GN Evans, MM Naim Omega 26 (1), 115-131, 1998 | 28 | 1998 |
The scope paradigm of business process re‐engineering GN Evans, R Mason‐Jones, DR Towill Business Process Management Journal 5 (2), 121-136, 1999 | 21 | 1999 |
Minimum Reasonable Inventory and the Bullwhip Effect in an Automotive Enterprise; A" Foresight Vehicle" Demonstrator MM Naim, SM Disney, GN Evans SAE Transactions, 196-203, 2002 | 17 | 2002 |
Process costing-the route to construction reengineering G Evans, M Naim, D Towill Proceedings of the Mouchel Centenary Conference Innovation in Civil …, 1997 | 15 | 1997 |
Educating the supply chain: an holistic approach GN Evans, MM Naim, DR Towill International Journal of Materials and Product Technology 11 (5-6), 464-476, 1996 | 14 | 1996 |
Assessing the impact of information systems on dynamic supply chain performance GN Evans, MM Naim, DR Towill Logistics Information Management 6 (4), 15-25, 1993 | 14 | 1993 |
Organising for improved construction interfaces GN Evans, A Bailey, M Reed, MM Naim, D Brown, DR Towill, M Riley Innovation in civil and construction engineering 49, 207-212, 1997 | 13 | 1997 |
Managerial skills development in R&D based NTBFs: Assisting managers to manage C Blaydon, W Keogh, G Evans International Journal of Entrepreneurial Behavior & Research 5 (4), 173-190, 1999 | 10 | 1999 |
Three–dimensional surface–topography assessments using a stylus/computer system PW O'Callaghan, RF Babus' Haq, SD Probert, GN Evans International Journal of Computer Applications in Technology 2 (2), 101-107, 1989 | 10 | 1989 |
Data flow G Evans, D Towill, M Naim Manufacturing Engineer 73 (3), 122, 1994 | 3 | 1994 |
Supply chain management: a process view of integrating manufacturing enterprises MM Naim, GN Evans, DR Towill IEE Colloquium on Internet Technology and the Integrated Enterprise (Digest …, 1997 | 2 | 1997 |
Case Study Details for the Paper" Pipeline Information Survey: A UK Perspective" D Berry, GN Evans, MM Naim Department of Maritime Studies and International Transport, University of …, 1998 | | 1998 |
Time Compression and Productivity Improvement: An On-site Analysis of an Alliance Project GN Evans, MM Naim, DR Towill Department of Maritime Studies and International Transport, Cardiff University, 1998 | | 1998 |
Computer Simulated Plant: Human Capital & Mobility Workshop, University of Wales, Cardiff, 1st-3rd April, 1995 [ie 1996] MM Naim, GN Evans Department of Maritime Studies and International Transport, University of …, 1996 | | 1996 |