Machine selection by AHP and TOPSIS methods R Karim, CL Karmaker American Journal of Industrial Engineering 4 (1), 7-13, 2016 | 154 | 2016 |
Value stream analysis of vegetable supply chain in Bangladesh: a case study R Karim, J Biswas International Journal of Managing Value and Supply Chains 7 (2), 41-60, 2016 | 30 | 2016 |
An integrated production inventory model of deteriorating items subject to random machine breakdown with a stochastic repair time HT Luong, R Karim International Journal of Industrial Engineering Computations 8 (2), 217-236, 2017 | 24 | 2017 |
Application of Lean Manufacturing Tools for Performance Analysis: A Case Study R Karim*, CML Rahman 3rd International Conference on Industrial Engineering and Operations …, 2012 | 21 | 2012 |
Impact of Changeover time on productivity: A case study R Karim International Journal Of Engineering & Technology 13 (6), 46-52, 2013 | 16 | 2013 |
Modelling a one retailer–one manufacturer supply chain system considering environmental sustainability and disruption R Karim, K Nakade International Journal of Systems Science: Operations & Logistics, 2020 | 13 | 2020 |
A stochastic model of a production-inventory system with consideration of production disruption R Karim, K Nakade International Journal of Advanced Operations Management 11 (4), 287-316, 2019 | 10 | 2019 |
A literature review on the sustainable EPQ model, focusing on carbon emissions and product recycling R Karim, K Nakade Logistics 6 (3), 55, 2022 | 9 | 2022 |
An integrated location-inventory model for a spare part’s supply chain considering facility disruption risk and CO2 emission R Karim, K Nakade Journal of Industrial Engineering and Management 14 (2), 87-119, 2021 | 8 | 2021 |
A performance analysis of OEE & improvement potential at a selected apparel industry CMLR Rubayet Karim* 6 th International Mechanical Engineering Conference &14 th Annual Paper …, 2012 | 8 | 2012 |
Waste identification in a pipe manufacturing industry through lean concept–A case study MS Rahman, M Tahiduzzaman, R Kundu, SM Juwel, MR Karim Journal of applied research on industrial engineering 5 (4), 306-323, 2018 | 6 | 2018 |
IMPLEMENTATION OF MAYNARD OPERATION SEQUENCE TECHNIQUE (MOST) TO IMPROVE PRODUCTIVITY AND WORKFLOW – A CASE STUDY MS Rahman, R Karim, S Miah, J Mollah Journal of Emerging Technologies and Innovative Research 5 (6), 270-278, 2018 | 6 | 2018 |
Cell Formation in a Batch Oriented Production System using a Local Search Heuristic with a Genetic Algorithm: An Application of Cellular Manufacturing System. R Karim, SK Biswas IOSR Journal of Engineering 5 (04), 28-41, 2015 | 6 | 2015 |
Stochastic analysis of an imperfect production-inventory system with consideration of random machine breakdown, rework, inspection, and environmental emissions R Karim, K Nakade International Journal of Industrial and Systems Engineering 39 (1), 71-122, 2021 | 4 | 2021 |
A literature review on cell formation problem in a batch-oriented production system R Karim, SK Biswas International Journal of scientific research and management (IJSRM) 3 (2 …, 2015 | 4 | 2015 |
Assessment of Critical Barriers to Industry 4.0 Adoption in Manufacturing Industries of Bangladesh: An ISM-Based Study S Hossain, S Hassan, R Karim Brazilian Journal of Operations & Production Management 20 (3), 1797-1797, 2023 | 3 | 2023 |
Analysis of a discrete-time Markov process with a bounded continuous state space by the Fredholm integral equation of the second kind K Nakade, R Karim RAIRO-Operations Research 56 (4), 2881-2894, 2022 | 2 | 2022 |
A Markovian production-inventory system with consideration of random quality disruption R Karim, K Nakade Journal of Advanced Mechanical Design, Systems, and Manufacturing 14 (5), 1-18, 2020 | 2 | 2020 |
Modeling Hospital Operating Theater Services: A System Dynamics Approach MM Rahman, R Karim, M Moniruzzaman, MA Hossain, H Younes Logistics 7 (4), 85, 2023 | | 2023 |
Optimal management of supply chain operations with consideration of disruption and environmental sustainability: a stochastic modeling approach R Karim | | 2021 |