Inventory management of multiple items with irregular demand: A case study G Nenes, S Panagiotidou, G Tagaras European Journal of Operational Research 205 (2), 313-324, 2010 | 143 | 2010 |
Optimal preventive maintenance for equipment with two quality states and general failure time distributions S Panagiotidou, G Tagaras European journal of operational research 180 (1), 329-353, 2007 | 117 | 2007 |
An economically designed, integrated quality and maintenance model using an adaptive Shewhart chart S Panagiotidou, G Nenes Reliability Engineering & System Safety 94 (3), 732-741, 2009 | 102 | 2009 |
Joint optimization of spare parts ordering and maintenance policies for multiple identical items subject to silent failures S Panagiotidou European Journal of Operational Research 235 (1), 300-314, 2014 | 94 | 2014 |
Statistical process control and condition‐based maintenance: A meaningful relationship through data sharing S Panagiotidou, G Tagaras Production and operations management 19 (2), 156-171, 2010 | 86 | 2010 |
Inventory control policies for inspection and remanufacturing of returns: A case study G Nenes, S Panagiotidou, R Dekker International Journal of Production Economics 125 (2), 300-312, 2010 | 63 | 2010 |
Optimal procurement and sampling decisions under stochastic yield of returns in reverse supply chains S Panagiotidou, G Nenes, C Zikopoulos OR spectrum 35, 1-32, 2013 | 52 | 2013 |
Joint optimization of manufacturing/remanufacturing lot sizes under imperfect information on returns quality S Panagiotidou, G Nenes, C Zikopoulos, G Tagaras European Journal of Operational Research 258 (2), 537-551, 2017 | 48 | 2017 |
Optimal integrated process control and maintenance under general deterioration S Panagiotidou, G Tagaras Reliability Engineering & System Safety 104, 58-70, 2012 | 44 | 2012 |
Evaluation of maintenance policies for equipment subject to quality shifts and failures S Panagiotidou, G Tagaras International Journal of Production Research 46 (20), 5761-5779, 2008 | 42 | 2008 |
Joint optimization of spare parts ordering and age-based preventive replacement S Panagiotidou International Journal of Production Research 58 (20), 6283-6299, 2020 | 28 | 2020 |
The variable sampling interval control chart for finite-horizon processes G Nenes, P Castagliola, G Celano, S Panagiotidou IIE transactions 46 (10), 1050-1065, 2014 | 26 | 2014 |
A Bayesian model for the joint optimization of quality and maintenance decisions G Nenes, S Panagiotidou Quality and Reliability Engineering International 27 (2), 149-163, 2011 | 16 | 2011 |
An adaptive Bayesian scheme for joint monitoring of process mean and variance G Nenes, S Panagiotidou Computers & operations research 40 (11), 2801-2815, 2013 | 15 | 2013 |
End-of-life tire recovery: the Thessaloniki initiative S Panagiotidou, G Tagaras Managing Closed-Loop Supply Chains, 183-193, 2005 | 14 | 2005 |
A Bayesian condition-based maintenance and monitoring policy with variable sampling intervals D Kampitsis, S Panagiotidou Reliability Engineering & System Safety 218, 108159, 2022 | 11 | 2022 |
Potassium catalyzed hydrogasification of low-rank coal for synthetic natural gas production G Skodras, S Panagiotidou, P Kokorotsikos, M Serafidou Open Chemistry 14 (1), 92-109, 2016 | 10 | 2016 |
A sequential monitoring Bayesian control scheme for attributes S Panagiotidou, G Nenes, P Georgopoulos Quality Technology & Quantitative Management 17 (1), 108-124, 2020 | 6 | 2020 |
The value of sampling inspection in a single-period remanufacturing system with stochastic returns yield C Zikopoulos, S Panagiotidou, G Nenes Advances in Production Management Systems. New Challenges, New Approaches …, 2010 | 5 | 2010 |
An analysis of maintenance education and training needs in European SMEs and an IT platform enriching maintenance curricula with industrial expertise Y Bakouros, S Panagiotidou Proc. of CM-MFPT 2008, 5th Int. Conf. on Condition Monitoring & Machinery …, 2008 | 4 | 2008 |