Traffic capacity, speed, and queue-discharge rate of Indiana’s four-lane freeway work zones Y Jiang Transportation Research Record 1657 (1), 10-17, 1999 | 149 | 1999 |
A platoon-based traffic signal timing algorithm for major–minor intersection types Y Jiang, S Li, DE Shamo Transportation Research Part B: Methodological 40 (7), 543-562, 2006 | 101 | 2006 |
Electrical load prediction of healthcare buildings through single and ensemble learning L Cao, Y Li, J Zhang, Y Jiang, Y Han, J Wei Energy Reports 6, 2751-2767, 2020 | 67 | 2020 |
A model for estimating traffic delays and vehicle queues at freeway work zones Y Jiang Journal of the Transportation Research Forum 40 (4), 65-81, 2001 | 55 | 2001 |
Application of cracking and seating and use of fibers to control reflective cracking Y Jiang, RS McDaniel Transportation Research Record, 150-150, 1993 | 52 | 1993 |
High temperature properties of high viscosity asphalt based on rheological methods X Qin, S Zhu, X He, Y Jiang Construction and Building Materials 186, 476-483, 2018 | 50 | 2018 |
A model for estimating excess user costs at highway work zones Y Jiang Transportation Research Record 1657 (1), 31-41, 1999 | 50 | 1999 |
Measuring and analyzing vehicle position and speed data at work zones using global positioning systems Y Jiang, S Li ITE journal 72 (3), 48-53, 2002 | 42 | 2002 |
Cost effectiveness of new roadway lighting systems Y Jiang, S Li, B Guan, G Zhao Journal of traffic and transportation engineering (English edition) 2 (3 …, 2015 | 38 | 2015 |
Determination of contract time and incentive and disincentive values of highway construction projects Y Jiang, H Chen, S Li International Journal of Construction Education and Research 6 (4), 285-302, 2010 | 29 | 2010 |
Evaluation of pavement surface friction treatments. S Li, S Noureldin, Y Jiang, Y Sun Purdue University. Joint Transportation Research Program, 2011 | 28 | 2011 |
Analysis and determination of axle load spectra and traffic input for the mechanistic-empirical pavement design guide Y Jiang, S Li, TE Nantung, H Chen Joint Transportation Research Program, 2008 | 28 | 2008 |
Determination of INDOT highway construction production rates and estimation of contract times Y Jiang, H Wu Purdue University, 2004 | 28 | 2004 |
Friction surface treatment selection: Aggregate properties, surface characteristics, alternative treatments, and safety effects S Li, R Xiong, D Yu, G Zhao, P Cong, Y Jiang Joint Transportation Research Program, 2017 | 27 | 2017 |
Durability and retro-reflectivity of pavement markings (synthesis study) Y Jiang Joint Transportation Research Program, 2008 | 27 | 2008 |
Production rates of highway construction activities Y Jiang, H Wu International Journal of Construction Education and Research 3 (2), 81-98, 2007 | 26 | 2007 |
Development of vehicle platoon distribution models and simulation of platoon movements on Indian rural corridors Y Jiang, S Li, DE Shamo Joint Transportation Research Program, 72, 2003 | 22 | 2003 |
Field evaluation of selected light sources for roadway lighting Y Jiang, S Li, B Guan, G Zhao, D Boruff, L Garg, P Patel Journal of traffic and transportation engineering (English edition) 5 (5 …, 2018 | 21 | 2018 |
Laboratory evaluation of critical properties and attributes of calcined bauxite and steel slag aggregates for pavement friction surfacing D Yu, R Xiong, S Li, P Cong, A Shah, Y Jiang Journal of Materials in Civil Engineering 31 (8), 04019155, 2019 | 20 | 2019 |
A method for highway agency to estimate highway construction durations and set contract times Y Jiang, H Wu International Journal of Construction Education and Research 3 (3), 199-216, 2007 | 20 | 2007 |